|
|
Projects
-
PV Mobile Testing PROJECT SUMMARY: work in progress
funded by ELECTRI International
-
Transmission & Distribution (T&D) Worksite Shock Protection PROJECT SUMMARY: work in progress
funded by ELECTRI International
-
Control of Plastic Hinging Behavior of RC Bridge Systems PROJECT SUMMARY: This NEESR payload project is to accurately model and control plastic hinging locations in concrete bridge structures through an investigation of actual hinging behavior in large-scale testing of 4-span bridge systems subjected to multiple excitations that includes the effects of joint and foundation flexibility at the NEES site at the University of Nevada Reno (NSF Award #0420347).
- Bridge Deck Cracking - Phase I
- PROJECT SUMMARY: Pooled Fund Study for the Construction of Crack-Free Concrete Bridge Decks.
- Corrosion Research - PROJECT
SUMMARY: Accelerated testing for concrete reinforcing bar corrosion
protection systems.
- Field Determination of Soil Lime Content
- PROJECT SUMMARY: A major factor in pavement performance is the quality of the
subgrade soil. Clay soils in particular can present great problems in pavement design due
to uncertainty associated with their performance.
|